WEIRD SNAFU ON WB BELTLINE IN MONONA

Early this morning,  construction crews poured concrete in the far right lane over the Yahara River bridge; this lane is blocked off to traffic.  Unfortunately,  the cuts and new concrete stretched a tad into the right travel lane; as vehicles drove over it this morning they created 4-6 foot holes in the right lane.   It is too dangerous to allow vehicles to drive in this lane now.

Beltline Bob has the right travel lane BLOCKED from Monona Dr nearly over the entire bridge.  This area already had crooked and skinny lanes and shifts due to the construction prior to this happening.  Big delays are ensuing.

The lane will remain closed for an undetermined amount of time.

Share