{"id":8327,"date":"2014-08-08T15:59:18","date_gmt":"2014-08-08T20:59:18","guid":{"rendered":"https:\/\/madtowntraffic.com\/?p=8327"},"modified":"2014-08-15T15:43:10","modified_gmt":"2014-08-15T20:43:10","slug":"construction-update-mineral-point-rdjunctionwatts-week-811","status":"publish","type":"post","link":"https:\/\/madtowntraffic.com\/construction-update-mineral-point-rdjunctionwatts-week-811\/","title":{"rendered":"CONSTRUCTION UPDATE: Mineral Point Rd\/Junction\/Watts; week of 8\/11."},"content":{"rendered":"
WATTS RD: \u00a0<\/b>Reduced to one lane in each direction.<\/p>\n
This entire project is slated to be COMPLETE by the end of this month. \u00a0<\/b><\/p>\n","protected":false},"excerpt":{"rendered":"
MINERAL POINT RD: \u00a0 Work includes reconstruction of the medians, \u00a0electrical work, \u00a0landscaping, \u00a0and putting signs up. \u00a0Mineral Point Rd is two lanes in both directions. JUNCTION RD: \u00a0Work includes reconstruction of the medians, \u00a0electrical work, \u00a0landscaping, putting signs up, \u00a0asphalt paving, \u00a0and pavement markings. \u00a0Junction Rd is one\u00a0lane in each direction from the Valley… Read more »<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[2],"tags":[],"jetpack_publicize_connections":[],"yoast_head":"\n