{"id":8341,"date":"2014-08-11T06:06:29","date_gmt":"2014-08-11T11:06:29","guid":{"rendered":"https:\/\/madtowntraffic.com\/?p=8341"},"modified":"2014-08-15T15:42:45","modified_gmt":"2014-08-15T20:42:45","slug":"construction-update-beltline-mineral-point-rd-week-811","status":"publish","type":"post","link":"https:\/\/madtowntraffic.com\/construction-update-beltline-mineral-point-rd-week-811\/","title":{"rendered":"CONSTRUCTION UPDATE: Beltline between Mineral Point Rd & Terrace Ave; week of 8\/11."},"content":{"rendered":"
The WB Beltline ramp from Old Sauk Rd will be CLOSED this coming weekend, Aug 15-17. \u00a0\u00a0<\/strong> Two lanes of traffic will be in place during the day. \u00a0Weather permitting,\u00a0overnight\u00a0lane closures will occur between 7pm-6am.<\/p>\n Additional ramp closures at Old Sauk Rd an Greenway Blvd may also occur between 7pm-6am.\u00a0<\/span><\/p>\n <\/p>\n","protected":false},"excerpt":{"rendered":" The WB Beltline ramp from Old Sauk Rd will be CLOSED this coming weekend, Aug 15-17. \u00a0\u00a0Work is scheduled to be completed by November 14. \u00a0 Two lanes of traffic will be in place during the day. \u00a0Weather permitting,\u00a0overnight\u00a0lane closures will occur between 7pm-6am. Additional ramp closures at Old Sauk Rd an Greenway Blvd may… Read more »<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[2],"tags":[],"jetpack_publicize_connections":[],"yoast_head":"\n
Work is scheduled to be completed by November 14. \u00a0<\/span><\/p>\n