{"id":8396,"date":"2014-08-25T16:01:48","date_gmt":"2014-08-25T21:01:48","guid":{"rendered":"https:\/\/madtowntraffic.com\/?p=8396"},"modified":"2014-08-29T15:27:47","modified_gmt":"2014-08-29T20:27:47","slug":"beltline-construction-update-90-todd-dr","status":"publish","type":"post","link":"https:\/\/madtowntraffic.com\/beltline-construction-update-90-todd-dr\/","title":{"rendered":"BELTLINE: Construction update between I-90 & Todd Dr."},"content":{"rendered":"
\u00a0 Nightly lane closures between 7pm-6am with two lanes closed at 8pm 7 days a week.\u00a0<\/span><\/p>\n The Park St work will continues. \u00a0\u00a0<\/span><\/p>\n A traffic switch WB took placed over the past weekend. <\/span><\/p>\n The EB crossover\/separated lanes continues, but the single lane will be shifted. <\/span><\/p>\n The NB Hwy 14\/Park St ramp to the WB Beltline remains closed until the first week of September. \u00a0<\/span><\/p>\n Overnight ramp closures are scheduled this week. \u00a0 A portage message sign will warn of what ramps will be closed and when.\u00a0 \u00a0 Nightly lane closures between 7pm-6am with two lanes closed at 8pm 7 days a week.\u00a0 The Park St work will continues. \u00a0\u00a0 A traffic switch WB took placed over the past weekend. The EB crossover\/separated lanes continues, but the single lane will be shifted. The NB Hwy 14\/Park St ramp to the WB Beltline… Read more »<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[2],"tags":[],"jetpack_publicize_connections":[],"yoast_head":"\n
Work continues through mid-September.<\/p>\n","protected":false},"excerpt":{"rendered":"