BELTLINE CONSTRUCTION UPDATE: Terrace Ave – Mineral Point Rd; week of Sept 1-5

FROM THE DOT: 

– Noise wall construction will continue with post installation proceeding toward Old Sauk Road.  Precast wall panels will continue to be placed as deliveries are received.

– Storm sewer installation will continue along the EB Beltline shoulder from Old Sauk Road to Mineral Point Road.

– Asphalt paving will begin on the EB Beltline on ramp from Old Sauk Rd, and if the weather is nice, perhaps also on the WB off-ramp to Greenway Blvd.  

– Grading work will continue along the EB Beltline shoulder from Old Sauk Road to Mineral Point Road.

– Permanent erosion control materials will be installed along various areas of the EB Beltline shoulder where topsoil placement is completed.

 – Two lanes of traffic will be maintained during daytime hours. 

–  Single lane closures will occur nightly from 7:00PM – 6:00AM

– On ramp and off ramp closures at Old Sauk Road and Greenway Blvd will be needed periodically during construction and will only be closed during the nighttime hours of 7:00PM – 6:00AM.

Work is scheduled to be completed by November 14, 2014.     