CONSTRUCTION UPDATE: Beltline between Terrace Ave & Mineral Point Rd. Week of 9/15.

WB Beltline on-ramp from Greenway Blvd is CLOSED starting Sept 15 for approx 3 weeks. 

They will be making a new right turn lane,  storm sewer, curb & gutter, sidewalk improvements, traffic signal upgrades and removal of the existing concrete pavement.\

EB Beltline on-ramp from Old Sauk Rd is CLOSED until Sept 22. 

Two lanes of traffic will remain open during the day.

Weather permitting,  lane closures will occur nightly between 7pm-6am.

They are completing the following work:   Wider shoulders,  new concrete barrier wall,  noise wall, and storm sewer will be installed during this traffic stage as well as bridge repairs to the EB structure over Old Sauk Road.  Temporary traffic signals will be installed at the Greenway Blvd ramps.   An additional turning lane will be added at the WB Beltline off ramp to Greenway Blvd, as well as improvements made to the EB Beltline on-ramp from Greenway Blvd.

Work is expected to be completed by Nov 14.

Share